Tuesday, December 20, 2016

Trench Weir Design

Design of Trench Weir
Design Discharge Q40 1.47    
Design Flood Discharge Q100 120.00    
Length of river L 20.00 m  
River bed level Z 1020.00 amsl  
Ratio of area of opening to total area of trashrack surface over trench E1 0.50    
Ratio of opening in the trashrack likely to be clogged E2 0.40    
Coefficient of discharge through broad crested weir C 1.53    
Coefficient of discharge through opening Cd 0.46    
         
Assumed length for trench L' 10.00    
Discharge to pass through weir Q 2.21 m3/s 2.2
Specific Energy at any section of the stream E 0.17    
Width Required to pass design discharge W 0.65   0.65
         
Width by Considering velocity        
Velocity v 0.75 m/s  
Width W 0.15 m 0.15
Width required for 50% clogging W 0.30 m  
Minimum width Required Wmin 1.25 m  
         
Final width of weir at top W 1.25 m  
Final Length of trench L 10.39 m 10
         
constant depending on bottom profile of channel η 0.50    
         
Depth required d 1.00 m  
Area A 1.25 m2  
Velocity head at the end of trench H 0.17 m3/s  
Discharge  Q 2.26 m3/s  
         
Final Depth d 1.00 m  
         
Slope of trench   0.06    
Depth at end    1.625   1.63
Depth at Start (from Intake Criteria)   1.00    
Trench bottom slope level at start   1019.00 amsl  
Trench bottom slope level at end   1018.37 amsl  
         
Check for adequency of waterway        
Average depth   1.31    
Area   1.64    
Wetted Peimeter   3.25    
Slope Provided S 0.06    
Mannings Coefficient   0.0018    
Discharge  Q 25.22 m3/s  
         
Check for adequency of capacity with 50% area clogged        
Average depth   0.66    
Area   0.82    
Wetted Peimeter   2.56    
Slope Provided S 0.06    
Mannings Coefficient   0.00    
Discharge  Q 13.16    
Slope of trashrack   0.10    
Width of trashrack   1.30    
         
Design flood discharge (Qflood)   120 m3/s  
Discharge Passing through the Spilling portion   0 m3/s  
Provide height of the weir above river bed level           =   0 m  
Qweir(flood)  = Cw * L weir * H overtop 3/2  
coefficient of discharge   2.2 assumed  
Weir Crest width L weir =    17    
 Head over crest =   2.18 m  
         
River Bed level at Weir axis          =   1020.00 m  
Crest level of weir                        =   1020.00 m  
High Flood Level                          =   1022.18 m  
         
Scour Depth Calculation  
Design Flood  Q25 84.0 m3/s
Width of Stilling Basin @ Q25 B 17.0 m
Specific Discharge q 4.94 m3/s
Average Particle size D 7.28 mm
Silt Factor f=1.76*D50^0.5 4.7  
Lacy's Scour Depth R=1.35 *(q^2/f)^(1/3) 2.3 m
Adopted U/S Scour Depth= Cutoff wall 1.25R 2.91 m
Adopted D/S Scour Depth= Cutoff wall 1.5R 3.5 m
         
Design flood discharge (Qflood)     85.0 m3/s
Discharge Passing through the Spilling portion     0 m3/s
Provide height of the weir above river bed level           =     0 m
Qweir(flood)  = Cw * L weir * H overtop 3/2
coefficient of discharge     2.2 assumed
Weir Crest width L weir =      17  
Head over crest =     1.73 m
High Flood Level     1021.73  
Bottom of cut off U/S     1018.82  
Height of Cutoff U/S     1.18 1.16
Bottom of cut off D/S     1018.23  
Height of Cutoff D/S     1.79143 1.75

Baitadi district

Ntc Office Gadi
Tudikhel, Gadi, Baitadi
Sahilek and Kathpatey
Village down along NilGad
Ghatte Gad and Gwallek Dhura
Malikarjun from Baitadi
Gothalapani Bazar 
Gothalapani Bazar and villages below 
 Near Kathpatey 
From Kathpathey
From Kathpathey
Near Kathpatey
Veer near Kathpathey
Way to Giregada
Way to Giregada
Telecom tower
Telecom Tower
Villages near Kathpatey
Women carrying grass
Kathpatey
Kathpatey-Sahilek road
Kathpatey-Sahilek road
Gadi from Kathpatey-Sahilek road
Gadi and Indian hills from Kathpatey-Sahilek road
Kathpatey-Sahilek road